To Build Fit Enterprise Solutions, Be Physical …

The British and the Americans speak the same language. But, say “I have a flat” to a British, and it means something completely different than said to an American. The former would congratulate you, and the latter would feel sorry for you. Flat in the UK means an apartment. Flat in Houston means a flat tire. The same 4 words, arranged in the exact same way, in what is ostensibly the same language, and yet either speaker would confuse their audience, if the audiences were transposed.

It is the same thing in business – if you cross different corporate cultures or even inter-organizational boundaries, industry terminology might sound the same but mean very different things. Sometimes we think we are communicating, but we are not.

Why is this a problem? Because it is not possible to build an enterprise data management solution to serve all departments without addressing variations in expectations for the same word. Especially if the term in question is one that defines your organization’s values and activities.

“Sometimes we think we are communicating, but we are not”

In the corporate world of Energy E&P, the word “completion” means different things to the different departments. If you mention a “Completion” to a Landman, he will assume you are referring to the subsurface horizon for his leases (it is more complex than this, but for the sake of this argument we need not dive into details). If a “Completion” is referenced to a Production Engineer, she immediately thinks of the intersection of a wellbore and a reservoir horizon. To a Completion Engineer, the same term means the process of completing a well after the well has reached final depth.

As organizations’ data management practice become more matured, they start to make their way towards the right of the EIM MM (Enterprise Information Management Maturity Model). Centralized solutions such as Master Data Management (MDM) are important and are designed to serve ALL departments to break as many silos as possible.

Naturally, to create a centralized solution that addresses needs across the enterprise, you must first reach consensus on how to build that solution. The solution must ensure that the data is NOT LOST, NOT OVERWRITTEN and is FULLY CAPTURED and useful to EVERYONE. What is the best way to reach consensus without the risk of losing data?

Get Physical

To answer the above question, many agree that information systems need to be built based on the physical reality to gather granular data …

By basing your data on the physical world and capture granular data as practically possible, you not only make it possible to capture all related information but also possible to report it in any combination of grouping and queries. See the example in figure 1.

Focus on Enterprise Needs and Departmental needs will follow…

I have seen systems that ignore wellbore data yet store only completions per well. At other clients, I have seen systems that take short cuts by storing wells, wellbore and wellbore completion data in one line (this necessitates overwriting old completion data with new everytime there is a change), these are “fit-for-purpose” systems.  These are not enterprise level solutions, but rather serve departmental needs.

Too often systems are designed for the need of one group/department/purpose rather than for the need of the company as a whole. However, if the needs of the whole are defined and understood, both company and groups will have what they need and then some.

Let’s look at an example to clarify this position:

Figure 1 Multi lateral well

Figure 1 Multi lateral well

In Figure 1 above, how would you store the data for the well in your organization or your department? Would you define the data captured as one well, three bores, and three completions? Or maybe two completions? One?
Depending on your department or organizational definitions, any of the above definitions could be fit-for-purpose correct. Accounting systems might keep track of ONLY one completion if it made Payroll and Tax sense. While Land may only keep track of 2 completions if the bores are in two zones. An engineer would track three completions and will be specific to one completion per wellbore. The regulatory department may want you to report something entirely different.
How do we decide the number of completions so that the information is captured accurately, yet remains useful to a Landman, Accountant, Engineer, and Geoscientist? Build based on the physical reality and stay granular.
In Figure 1, physically speaking, we see one well with three paths (3 wellbores). Each bore has its own configuration that open to the reservoir (completions). In total, this well has three different ‘Completions’,  one ‘Completion’ for each of the horizontal bores.
Accounting can query how many different cost centers the well has, and depending on the production (and other complex rules) the answer could be three but it could be 1.  Depending on the lease agreement, Landman could get a result of one or 3 completions. An engineer can also easily query and graph this data to find the three pathways, and determine each completion job per wellbore.
While it could be argued that data needs to be presented differently to each department, the underlying source data must reflect the physical truth. After all, we cannot control what people call things and certainly cannot change the lingo.

$250 Million Oil Take-Over Deal Implodes Due To Disastrous Data Management

As professionals in the oil and gas sector we all know that when it comes to a merger and acquisition (M&A) that having access to quality data is essential. In its absence deals don’t get made, investors lose $000,000s and livelihoods are put at risk.

So we were pretty taken aback recently to hear of one deal – of a public company – which fell through because the organization couldn’t even list their complete assets with confidence – such was the mess of their data.

We were talking with a CEO recently who “vented” about a recently failed acquisition.  He is a major player who has worked in the sector since the mid-1970s, he told us here why the $150 Million to $250 million investment his company was prepared to make didn’t just fall flat, but imploded:  “Despite asking this company repeatedly to give us access to their “complete” data sets they failed to deliver time and again. We became increasingly frustrated and discouraged to the extent we wouldn’t even make a proposal in the region of $80 million for the company.  What was so galling to us was that it was obvious this company badly needed an investor and had approached us to bid”

We all know what data is needed for M&A investments to happen, some of which we can get from public records and from commercial organizations such as I.H.S and Drilling Info (in the USA). But those sources alone are not nearly sufficient. So what were they thinking? Did they think data would take care of itself? Or was someone just not doing his/her job well?

The CEO continues “…. in the past when companies were under pressure, typically a lot of data got swept under the rug as it were. Today though, investors demand tighter regulation of data and I suspect that, because of this, in ten years’ time some companies just aren’t going to make it. If our company had been allowed to invest and take over we could have solved many of the organization’s problems, saved some jobs and even added value. Sadly, in this event, due to poor management of critical data that scenario was never allowed to take place. The deal never even got past the first hurdle. No-one is going to invest $millions when they don’t have a clue of (or confidence in the data of) what they’re buying.”

Considering this was a company which had a responsibility for public money the management team should never have been allowed free rein without critical data management regulations or at the very least “guidelines”.

What is your opinion?